Rare document Chernobyl USSR Detailed design Drawings roadconstruction project
Working project Bridge across the outlet channel forsupplying building materials to power units No. 5 No. 6 of the ChernobylNuclear Power Plant.
Drawings HighwayChernobyl Nuclear Power Plant Slavutych.
There are 18 drawingsin this folder
The workingdrawing of the span structure of the bridge across the cooling channel of theChernobyl Nuclear Power Plant is included in the set of working documentationfor the highway - the city of Slavutych.
The drawings weredeveloped on the instructions of the general designer of the complex of theInstitute \"Ukrgiprodor\" of the USSR Mindorostroy on the basis of theCouncil of Ministers of the USSR dated 10/14/1986.